SITE DETAILS:
Name: Ashfield Girls HS
Location: Hollywood Rd, Belfast
North Ireland BT4 2LY
Building Type: School
Heating Type: Gas Fired Boilers
TRIAL PERIODS:
Original Control:
01/12/2004 - 30/11/2005
Fuelstretcher:
01/12/2005 - 30/11/2006
SITE COMMENTS:
Belfast Education and Library Board maintained Trend BMS
Installer Collins Electric
Single Boiler House – 3 Boilers – Plant Room HWS Calorifier
SITE DETAILS:
Name: Rathmore Grammar School
Location: ,Kingsway Finaghy Belfast
Building Type: School
Heating Type: Gas Fired Boilers
TRIAL PERIODS:
Original Control:
01/07/2005 - 31/12/2005
Fuelstretcher:
01/07/2006 - 31/12/2006
SITE COMMENTS:
New Independent School with Satchwell MICRONET Controller and BMS
Installer ATC
Single Boiler House – 3 Boilers – Plant Room Calorifier
SITE DETAILS:
Name: St Patrick's School
Location: 29 Antrim Road, Belfast
North Ireland BT 15 4DZ
Building Type: School
Heating Type: Gas Fired Boilers
TRIAL PERIODS:
Original Control:
01/03/2005 - 31/12/2005
Fuelstretcher:
01/03/2006 - 31/12/2006
SITE COMMENTS:
Belfast Education and Library Board maintained
Installer WR Beckett
Single Boiler House – 2 Boilers under control. Dedicated separate boiler for HWS
SITE DETAILS:
Name: Gilnahirk Primary School
Location: 148 Gilnahirk Road, Belfast
BT16 1TH
Building Type: School
Heating Type:
TRIAL PERIODS:
Original Control:
01/04/2005 - 31/01/2006
Fuelstretcher:
01/04/2006 - 31/01/2007
SITE COMMENTS:
South Eastern Education and Library Board maintained.
Installer William McCormick.
Single Boiler House – 2 Boilers – Plant Room HWS Calorifier
SITE DETAILS:
Name: Omagh High School
Location: 14 Crevanagh Rd, Omagh
BT79 OEQ
Building Type: Large School
Heating Type: Oil Fired
TRIAL PERIODS:
Original Control:
01/04/2005 - 31/03/2006
Fuelstretcher:
01/04/2006 - 31/01/2007
SITE COMMENTS:
Western Education and Library Board maintained
Installer GE Heating
Single Boiler House – 3 Boilers – Plant Room HWS Calorifier
SITE DETAILS:
Name: St Mary's High School Limvady
Location: Irish Green Street, Limavady
Londonderry BT49 9AN
Building Type: Large School
Heating Type: Oil Fired School
TRIAL PERIODS:
Original Control:
01/04/2005 - 31/03/2006
Fuelstretcher:
01/04/2006 - 31/01/2007
SITE COMMENTS:
Western Education and Library Board maintained
Installer GE Heating
Two Boiler Houses – 1X3 Boilers – 1X4 Boilers - Plant Room HWS Calorifier
|
Consumption |
DegreeDays |
Consumption/DegreeDays |
Existing System |
145000.00 |
2269.00 |
63.90 |
Fuelstretcher |
80500.00 |
1521.00 |
52.93 |
SAVING |
|
|
17.18% |
